-
Questions about Workflow
Hi, We have approve-publish workflow and its working as usual for Content Types, but when we associate this workflow to Channel (Object Type), Channel is getting Approved and its not getting published if the reviewer approved. Kidly please help how to fix this issue? Thanks Jayaram
-
Latest actuate designer pro works correctly on iHub 3.1
<p>Hello,</p> <p> </p> <p>I suddenly had a problem where I could not publish .data files to our server anymore.</p> <p>When I generate the .data file from a .datadesign file and tried to publish it the .data file was not visible in the selection screen where you choose the files you want to publish. </p> <p> </p> <p>So I…
-
Using BIRT with MongoDB with query result greater 16Mb
<p>I use BIRT Designer Version 4.5.0.v201506092134 Build and MongoDB 3.2.<br> I use aggregation with the model parameters for generating reports.<br> If the query result exceeds 16Mb(standard limit for the maximum document size in MongoDB ), then generated a blank report.<br> If I use the aggregation with the given values,…
-
What is Birt Best Practice
<p>Hello All,</p> <p> </p> <p>I am new to BIRT, i installed eclipse for BIRT but i found some boor components, during reading i found other BIRT based products such as ihub, Analytics Designer and F-Type</p> <p> </p> <p>i got confused what to start with as an open source product,</p> <p> </p> <p>please let me know what are…
-
Websphere causing deployments to fail on Application server
We are on TS/OD/Livesite 8.1 on Windows Server 2012 R2. We have been observing some intermittent issue with Open Deploy trying to deploy xsl files to app server. On checking the logs on receiver it displays rename failed from .iwnew to original filename. this is happening not to a specific file but only to xsl files. On…
-
Line charts - dynamically changing line style for future dates
<p>Hi,</p> <p>I am using Actuate BIRT Designer Professional v 4.2.3.</p> <p> </p> <p>I have a line chart with a solid line. I wish to dynamically change the line style to dotted line for future dates, whilst still plotting the solid line for past dates in the same series.</p> <p> </p> <p>How might I be able to do this…
-
Failed to instantiate a workflow model
I have a asset deployment workflow which works fine on UAT env, but on QA env the workflow fails to start and hence no deployment is done. I get the following message when I try to use it "Failed to instantiate a workflow model". Following is the detailed description of this(after hitting "click here") Root cause:…
-
Incremental Load
<p>How do I do incremental load in ihub after first cache?</p>