Discussions
-
Recent versions of BIRT/Eclipse show a blank pie chart with Eclipse MAT
<p>Hi, when launching the <a data-ipb='nomediaparse' href='https://wiki.eclipse.org/index.php?title=MemoryAnalyzer/Contributor_Reference#Workspace'>Eclipse MAT RCP</a>, after loading a heapdump, the interactive pie chart on the Overview pane is blank (although a placeholder of the correct size exists). I'm launching from…
-
PLC Workflow issue
Hello, I am getting the below error when I try to publish a page using the PLC workflow. Any immediate help is much appreciated. Error during task execution: Review Notification Email, message: null *** START STACK TRACE *** com.interwoven.livesite.workflow.task.EmailTask.buildEnvironmentDocument(EmailTask.java:305)…
-
Parameter page doesn't display without a visible required field
<p>We are using BIRT 2.6.2 with TRIRIGA 10.4.1. We have a report with three parameters—one is the record ID, which is passed from TRIRIGA and hidden from the user; the other two are optional but we want the user to be able to enter them if desired. When we run the report from inside TRIRIGA, no parameter page shows up.…
-
deployment config file with multiple target
Hi All, I have attached to open deploy config file, please let me know if we can have multiple targetfilesystem inside the definition for the same source. PSB, odconfig.txt please let me know if odconfig file is ok or have error. if issue then what is other way to do this. thanks…