Discussions
-
Naming Exported files from BIRT - not working
<p>Hello everyone,</p><p> </p><p>I am trying to generate a report that when I extract it to .xls file, the filename would have a date on it and also, if possible that the name of the report is not base on the rptdesign file.</p><p> </p><p>I found <a data-ipb='nomediaparse'…
-
How to integrate Birt 4.2 with JSF 2.0
<p>Hi</p><p> </p><p>Im new in birt,I want to integrate birt with jsf 2.0.</p><p>How can i integrate birt 4.2 with jsf 2.0.</p><p> </p><p>can anyone send me sample project please?</p><p> </p><p>Thanks </p>
-
how to grow the height of the data element dynamically in grid?
<p>Hi I have placed a data element in the grid. The data element is mapped to a database column. The data element should have fixed width and it has to grow it's height dynamically based on the length of the data and the data should be wrapped in the data element. How can we achieve this?</p>
-
Dynamic Marker Line based on Data
I built this example based on requirement from a forum post.<br /><br />* I am using the Drop-Detail on the cell with the chart (that is why it looks like the chart and details are together).<br /> * I created a marker<br /> * I created a page variable to store data.<br /> * I dynamically adjusted the marker based on the…
-
Problem starting workflow from Action menu item
Hi, I'm trying to create menu items in webtop that will open a template (a partially filled word doc), save it and start a work flow. I've got then menu items configured and working to a point: * The user chooses a template from the menu. * The template/word document opens locally, and I can fill it out, save it. * It…
-
Error while trying to create custom object type(created & installed through XCP Designer) through DA
Hi all, I created and installed a xcp designer proj and it works fine. And as a part of the proj artifact, I created a custom content type - sha_invoice. When I try to create a object of this type through DA Import feature or DFC, I am facing the below error. please advise me on how to overcome these issues. Error in…
-
Limit Report to 30 days of history and six months form today
<p><span style="font-size:medium;">[font="calibri;"]I am building a shop floor loading graph and only want to show 30 days back (past due) from the current date and six months into the future.[/font]</span></p><p> </p><p><span style="font-size:medium;">[font="calibri;"]I have the graph grouping set to one week intervals…