Discussions
-
BIRT Viewer Toolkit - Exporting Content - configurable?
<p>Hi,</p><p> </p><p>I am trying out the BIRT Viewer Toolkit and have a few questions regarding Exporting Content of reports:</p><p> </p><p><strong>Scenario: Report designed to export to one Excel worksheet (i.e. one page)</strong></p><p>The report displays correctly in the viewer in the browser and in my case has 271…
-
Handling Drilldown Reports in Java
<p>I am using the Report Engine (birt 3.7.2) to generate PDF and HTML reports from a Java class. Everything is working fine except for drilldown links which run other reports with passed parameters. I assume I need to implement an Action Handler but cannot find an example. Can you please provide a Java example fo handling…
-
ï£µî ±zdvw2374
<a class='bbc_url' href='http://fuadadman.com'><strong class='bbc'>christian louboutin outlet</strong></a> but, they are known for superior talkers but they recover it inside of individual, which way affectionate they happen to be and / or becoming a parrot it is possible to training purchasing for their clients "A…
-
Create project from DAR while installing other projects
Hello, I'm using ant and composer to install projects to repository. I've got more projects for example from 0000 to 0005. Project with higher number is dependend on project with lower number (0000 < 0001 < 0002 ...) When I'm installing all projects everything is good. But when I skip project in which were no changes and…
-
Bubble Chart assistance
<p>I would like to build a bubble chart that plots:</p><p> </p><p>Y axis - gross units sold</p><p>X axis - net units sold</p><p>S axis - return units</p><p> </p><p>I want to color code the bubbles based on the product type, but I cannot find</p><p>where to set this value. All my test charts come out in one…
-
How to resize a field of CTD ?
I have a content type with instances already published , and we want to modify ( enlarge ( 100 - > 300 characters) the length of one of the fields was a Relator. We perform the database update , the CTD does not reflect the change in meter VCM and does not allow more characters (100) which we had previously defined . We…